China Gold Supplier for Manual Crimping Hose Machine - Steam Hose – Hengyu
Short Description:
China Gold Supplier for Manual Crimping Hose Machine - Steam Hose – Hengyu Detail:
MAIN APPLICATION: Using in petrochemical industry, shipyard for transfering Saturated and superheated steam.
TEMPERATURE RANGE: -40°C / +210°C (-40°F / +410°F) intermittent to 232°C (450°F)
INNER TUBE: Black EPDM.
REINFORCEMENT: Two high tensile steel braids.
COVER: Red EPDM perforated rubber with abrasion and ozone resistant.
| I.D | O.D | MAX W.P. | MIN B.P. | MIN B.R. | WEIGHT | |||||
| dash | DN | inch | mm | inch | bar | psi | bar | psi | mm | kg/m |
| -8 | 12 | 1/2″ | 23 | 0.98 | 18 | 270 | 180 | 2700 | 130 | 0.42 |
| -10 | 16 | 5/8″ | 26 | 1.02 | 18 | 270 | 180 | 2700 | 160 | 0.46 |
| -12 | 19 | 3/4″ | 31 | 1.26 | 18 | 270 | 180 | 2700 | 190 | 0.77 |
| -16 | 25 | 1″ | 38 | 1.5 | 18 | 270 | 180 | 2700 | 250 | 0.9 |
| -20 | 32 | 1 1/4″ | 46 | 1.81 | 18 | 270 | 180 | 2700 | 320 | 1.27 |
| -24 | 38 | 1 1/2″ | 52 | 2.05 | 18 | 270 | 180 | 2700 | 380 | 1.37 |
| -32 | 51 | 2″ | 67 | 2.64 | 18 | 270 | 180 | 2700 | 510 | 2.05 |
| -40 | 63 | 2 1/2″ | 81 | 3.19 | 18 | 270 | 180 | 2700 | 630 | 2.96 |
| -48 | 76 | 3″ | 94 | 3.7 | 18 | 270 | 180 | 2700 | 760 | 3.72 |
v:* {behavior:url(#default#VML);}
o:* {behavior:url(#default#VML);}
x:* {behavior:url(#default#VML);}
.shape {behavior:url(#default#VML);}
Product detail pictures:

Related Product Guide:
We rely upon strategic thinking, constant modernisation in all segments, technological advances and of course upon our employees that directly participate in our success for China Gold Supplier for Manual Crimping Hose Machine - Steam Hose – Hengyu, The product will supply to all over the world, such as: Benin, Libya, Eindhoven, Our company's main items are widely used all over the world; 80% of our products and solutions exported to the United States, Japan, Europe and other markets. All stuff sincerely welcome guests come to visit our factory.
This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.





